
The AirTAC GC200-06 FRL Unit (GC20006C1TK) is a genuine G-series three-unit F.R.L. combination: a separate filter, a separate regulator and a separate lubricator assembled as one air-preparation station. It has PT1/8" ports, a 40 µm element, a differential-pressure drain and regulates 0.15 - 0.9 MPa (20 - 130 psi).
The GC series is AirTAC's three-piece F.R.L. combination: a separate air filter, a pressure regulator and a lubricator supplied as one matched set. This GC20006C1TK is size 200 with NPT1/8 (1/8 in) ports. The filter bowl carries the standard 40 um element with a differential-pressure drain, the regulator adjusts from 0.15-0.9 MPa (20-130 psi) and reads on an external round gauge scaled in MPa, and the K suffix means a reverse (check) valve is fitted. The lubricator meters oil mist into the downstream air. Filter and lubricator bowls on this size are polycarbonate (PC). Maximum working pressure is 1.0 MPa (145 psi); operating temperature is -5 to 70 C.
This is a genuine AirTAC part. The G series is offered in sizes 200, 300, 400 and 600, with differential-pressure, automatic or manual drains, 40 um or 5 um (W) filtration, MPa, psi or bar gauge scales, and three thread types (NPT on this code). AirTAC publishes flow as curves rather than a single rated figure, so we confirm sizing and full datasheet figures for your application on request.
| Model | AirTAC GC200-06 FRL Unit (GC20006C1TK) |
|---|---|
| Series | GC200 F.R.L. combination |
| Composition | Filter + regulator + lubricator (3 units) |
| Port size | PT1/8" (NPT thread) |
| Filtering grade | 40 µm |
| Regulating range | 0.15 - 0.9 MPa (20 - 130 psi) |
| Pressure type | Standard type |
| Fluid | Compressed air |
|---|---|
| Max. working pressure | 1.0 MPa (145 psi) |
| Temperature range | -5 to +70 °C (unfreeze) |
| Drain type | Differential-pressure drain |
| Bowl material | PC |
| Pressure gauge | Fitted — round, MPa scale |
| Reflux valve | Fitted (reverse flow permitted) |
Specifications follow the official AirTAC G-series air-preparation data. The regulating band is set by the drain type: automatic and differential-pressure drains regulate 0.15 - 0.9 MPa, a manual drain regulates 0.05 - 0.9 MPa. Standard type, regulating 0.15 - 0.9 MPa (20 - 130 psi). The combination has no separate bracket code — the three units couple together with their own mounting hardware. Flow curves, weight and outline dimensions are not published in our data set — ask us and we will confirm from the factory datasheet.
| GC200 | G-series F.R.L. combination, 200 body — sets the port range. |
|---|---|
| 06 | Port size PT1/8". This body offers 06 = PT1/8", 08 = PT1/4". |
| (blank) | Drain: Differential-pressure drain — this also sets the regulating band (0.15 - 0.9 MPa (20 - 130 psi)). |
| (blank) | Standard type. Blank is standard, L is the low-pressure type. |
| (blank) | Pressure gauge fitted (blank). |
| C | Gauge shape: Round. C is round, F is square. |
| 1 | Gauge scale: MPa. 1 is MPa, 2 is psi, 3 is bar. |
| (blank) | Filtering grade 40 µm. Only 40 µm (blank) and 5 µm (W) exist. |
| T | NPT thread. PT is the default; G is BSPP and T is NPT. |
| K | Reverse-flow (reflux) valve fitted. |
Field order is size, port, drain, type, gauge, shape, scale, grade, thread, reflux — there is no bracket position on a combination. Constituent units, orderable separately as spares: GF200-06 filter, GR200-06 regulator and GL200-06 lubricator.
A GC is three separate units, so the filter and the regulator can each be serviced or replaced on their own. A GFC is the two-unit set, where filtering and regulating share one body — shorter, but the two functions come as one part. Both filter, regulate and lubricate.
| This model | GC200 · PT1/8" · 40 µm |
|---|---|
| One size up | GC300 |
| Two-unit equivalent | GFC200-06 |
| Build order | Filter → regulator → lubricator |
Conditions the air feeding impact wrenches, clamps and air cylinders in a final-line assembly cell, with one regulator setting and one lubricator feeding the whole cell from a single 1/8 in drop.
Prepares air for the pneumatic valve island on a carton-forming machine: particulate and water removed ahead of the valves, pressure held steady, and oil mist supplied to the cylinder seals.
Serves a workshop tool drop where the check valve keeps the downstream circuit pressurised if the main header is vented, protecting regulator settings between jobs.
Size 200 with 1/8 in NPT ports is the entry step of the G range; step up to size 300, 400 or 600 for larger ports and higher flow. Drain here is the differential-pressure default; automatic (A) and manual (M) versions are catalogue options. The 40 um element is standard; choose the W code for a 5 um element. This set's external round gauge reads MPa; psi (2) and bar (3) scales exist, as do three thread types (NPT on this code). Flow is published as curves, not a single rating, so ask us to confirm sizing against your application before ordering.
Quick checklist
The PC bowls must not be cleaned with solvents — wipe them with a dry cloth. The lubricator adds an oil mist downstream of the regulator. If any branch of the line must stay oil-free, take that branch off before the lubricator, or use a GR200-06 regulator with a GF200-06 filter on that branch.
AirTAC publishes flow for the GC series as performance curves rather than a single rated figure, so we do not quote one number here. Send us your line pressure and required flow and we will confirm sizing against the datasheet on request.
K decodes as a reverse (check) valve fitted to the unit. The same size 200, NPT1/8 set is available without it under the corresponding code without the K suffix, with the rest of the configuration unchanged.
T selects NPT port threads, the North American taper pipe standard. Without it the same order code has PT (Rc) ports, and with G it has G (BSPP) ports; body, function and dimensions do not change.
Genuine AirTAC parts produced by AirTAC factory.
Covers non-human-caused product damage.
Most standard models are dispatched in 3-5 days.
Most inquiries answered within 7 hours.
Send us the quantity, thread type (PT / G / NPT), gauge scale and destination. We confirm price, availability and lead time — usually within 7 hours.