Airtac F-PB-CJ Rear Swing Bracket Assembly Kit F-PB12CJ

Airtac

Airtac F-PB-CJ Rear Swing Bracket Assembly Kit F-PB12CJ

$7.87 $15.37
sold in last hours
customers are viewing this product
Ask A Question
 
 
DELIVERY
Estimated delivery between and
Guarantee Safe Checkout
Airtac Online Distributors/Supplier Store
Description
Product Category: Cylinder Accessories Brand: AirTAC Series: F-PB-CJ Rear Swing Bracket Complete Assembly Kit The F-PB-CJ series from AirTAC is a precision-engineered rear swing mounting bracket solution designed for cylinder stabilization and angular alignment in pneumatic systems. This complete assembly kit ensures secure fixation of cylinders while accommodating swing motion, featuring corrosion-resistant materials and standardized mounting interfaces for seamless integration with ISO-compliant pneumatic cylinders. Optimized for industrial automation applications requiring precise mechanical linkage and vibration resistance.

AirTAC F-PB-CJ Rear Swing Bracket Kit F-PB12CJ Technical Details

  • Model: F-PB12CJ (Complete Bracket Package)
  • Material: Precision-machined aluminum alloy 6063-T5
  • Surface treatment: Hard anodized (15-20μm thickness)
  • Compatible cylinder bore: Φ12mm (Optimized for ADVC/ADVU series)
  • Max load capacity: 85N radial / 120N axial
  • Mounting hole pattern: 32mm × 16mm rectangular array
  • Fastener specs: M5×0.8 stainless steel screws (ISO 4762)
  • Rotation range: ±15° adjustable swing angle
  • Operating temp: -40℃ to 150℃ (ambient non-condensing)
  • Vibration resistance: 10-55Hz @ 1.5mm amplitude
  • Weight: 184g ±3% (including all mounting hardware)
  • Dimensions: 48mm(L) × 34mm(W) × 28mm(H) (compact profile)

Precision-engineered swing bracket with anti-backlash design, featuring dual angular contact bearings for smooth pivot motion. Includes pre-loaded wave washers to maintain clamping force under vibration. Anodized surfaces provide corrosion resistance in humid environments (tested to 96hrs salt spray).

Installation Scenarios:
  • Robotic end-effector tooling mounts
  • Conveyor system guide rail supports
  • Packaging machine rotary joint interfaces
  • Semiconductor handling arm linkages
  • Medical device actuator pivots
Mounting protocol: Apply 0.6-0.8Nm torque during assembly. Use thread locker (medium strength) on pivot screws. Lubricate bearing surfaces with ISO VG32 hydraulic oil before initial operation. Avoid overtightening - maximum deflection ≤0.05mm.


Property Property Value
sku F-PB12CJ
Shipping policies

Returns will be accepted for up to 15 days of Customer’s receipt or tracking number on Not used items. You, as a Customer, are obliged to inform us via email before you return the item, only in the case of:

  • Received the wrong item.
  • Item arrived not as expected (ie. damaged packaging).
  • Item had defects.
  • Over delivery time.
  • The shipper does not allow the goods to be inspected before payment.

The returned product(s) must be in the original packaging, safety wrapped, undamaged and unworn. This means that the item(s) must be safely packed in a carton box for protection during transport, possibly the same carton used to ship to you as a customer.

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
 
 

Recently Viewed

Explore your recently viewed items, blending quality and style for a refined living experience.