Airtac P-CPV15S Blanking Plate Assembly P-CPV15S-R2

Airtac

Airtac P-CPV15S Blanking Plate Assembly P-CPV15S-R2

$3.01 $10.51
sold in last hours
customers are viewing this product
Ask A Question
 
 
DELIVERY
Estimated delivery between and
Guarantee Safe Checkout
Airtac Online Distributors/Supplier Store
Description
1、The manifold valve block integrates solenoid valves with centralized inlet/exhaust ports and power supply via 25-pin D-Sub connector, maximizing space efficiency while reducing additional accessory requirements.
2、Features modular design with exceptional expandability, allowing flexible configuration of connected solenoid valve quantities. Includes optional blanking plate for customized assembly.
Category: Manifold End Plate , Brand: Airtac , Series: P-CPV15S

AirTAC P-CPV15S Blind Plate Assembly P-CPV15S-R2 Technical Details

  • Model: P-CPV15S-R2 (Revision 2)
  • Type: Non-through flow blind plate for CPV series manifolds
  • Material: Anodized aluminum alloy (AL6063-T5)
  • Port configuration: 2-port block (ISO 15407-1 compliant)
  • Port thread size: G1/8 (BSPP) or optional NPT1/8
  • Max working pressure: 1.0 MPa (145 psi)
  • Temperature range: -20℃ to 80℃ (-4°F to 176°F)
  • Seal material: Oil-resistant NBR (Nitrile) rubber (Shore A70±5)
  • Surface hardness: HV 120±15 (anodized layer)
  • Installation torque: 1.5-2.0 N·m (13-18 lb-in)
  • Weight: 48g ±2g (1.69 oz)
  • Dimensions: 15mm (W) × 15mm (D) × 10mm (H) / 0.59" × 0.59" × 0.39"
  • Compatibility: CPV10/15/20 series manifolds
  • Certification: RoHS compliant

Precision-machined sealing component designed to terminate unused ports in modular pneumatic manifolds. Features dual O-ring grooves with pre-installed seals and anti-vibration locking design. The diamond-knurled surface ensures tool-free manual installation while maintaining IP54-level dust/water protection when properly seated.

Typical Applications:
  • Blocking unused valve positions in CPV manifold systems
  • Maintenance safety isolation in production line pneumatics
  • Pressure test port sealing during system commissioning
  • Modular system reconfiguration in packaging machinery
  • Leak prevention in cleanroom automation equipment
Installation protocol: Clean port threads with IPA before assembly. Apply thread sealant only to male threads, avoiding contact with O-rings. Torque in 1/4-turn increments using a calibrated wrench. Re-torque after 24hr thermal cycling in high-vibration environments.


Property Property Value
sku P-CPV15S-R2
Shipping policies

Returns will be accepted for up to 15 days of Customer’s receipt or tracking number on Not used items. You, as a Customer, are obliged to inform us via email before you return the item, only in the case of:

  • Received the wrong item.
  • Item arrived not as expected (ie. damaged packaging).
  • Item had defects.
  • Over delivery time.
  • The shipper does not allow the goods to be inspected before payment.

The returned product(s) must be in the original packaging, safety wrapped, undamaged and unworn. This means that the item(s) must be safely packed in a carton box for protection during transport, possibly the same carton used to ship to you as a customer.

Reviews

Customer Reviews

Be the first to write a review
0%
(0)
0%
(0)
0%
(0)
0%
(0)
0%
(0)
 
 

Recently Viewed

Explore your recently viewed items, blending quality and style for a refined living experience.