
The AirTAC GC FRL Unit GC400C15ANK is a genuine G-series three-unit F.R.L. combination: a separate filter, a separate regulator and a separate lubricator assembled as one air-preparation station. It has See datasheet ports, a 40 µm element, a differential-pressure drain and regulates 0.15 - 0.9 MPa (20 - 130 psi).
GC400C15ANK is a GC-series three-piece F.R.L. combination from AirTAC: a separate air filter, pressure regulator and lubricator working as one set. The size 400 body is ported PT1/2, the filter bowl drains automatically, and the standard 40 um element removes water and particulate from the compressed air. The K code adds a reverse (check) valve, and the N code means no gauge is fitted on this configuration. Regulator adjustment range is 0.15-0.9 MPa (20-130 psi) with the automatic drain, maximum working pressure is 1.0 MPa (145 psi), and the 400-size bowls are polycarbonate, rated for -5 to 70 C.
This is a genuine AirTAC part. The G-series F.R.L. comes in sizes 200, 300, 400 and 600 with a choice of ports, PT (standard), G or NPT threads, differential-pressure, automatic or manual drains, 40 um or 5 um (W) elements, gauge options and an optional check valve. Flow is published as curves rather than a single rating, so we confirm the datasheet and flow figures for your application on request.
| Model | Airtac GC FRL Unit GC400C15ANK |
|---|---|
| Series | GC400 F.R.L. combination |
| Composition | Filter + regulator + lubricator (3 units) |
| Port size | See datasheet (PT thread) |
| Filtering grade | 40 µm |
| Regulating range | 0.15 - 0.9 MPa (20 - 130 psi) |
| Pressure type | Standard type |
| Fluid | Compressed air |
|---|---|
| Max. working pressure | 1.0 MPa (145 psi) |
| Temperature range | -5 to +70 °C (unfreeze) |
| Drain type | Differential-pressure drain |
| Bowl material | PC |
| Pressure gauge | Fitted — factory standard, Factory standard scale |
| Reflux valve | Not fitted |
Specifications follow the official AirTAC G-series air-preparation data. The regulating band is set by the drain type: automatic and differential-pressure drains regulate 0.15 - 0.9 MPa, a manual drain regulates 0.05 - 0.9 MPa. Standard type, regulating 0.15 - 0.9 MPa (20 - 130 psi). The combination has no separate bracket code — the three units couple together with their own mounting hardware. Flow curves, weight and outline dimensions are not published in our data set — ask us and we will confirm from the factory datasheet.
| GC400 | G-series F.R.L. combination, 400 body — sets the port range. |
|---|---|
| C1 | Port size See datasheet. This body offers 10 = PT3/8", 15 = PT1/2". |
| (blank) | Drain: Differential-pressure drain — this also sets the regulating band (0.15 - 0.9 MPa (20 - 130 psi)). |
| (blank) | Standard type. Blank is standard, L is the low-pressure type. |
| (blank) | Pressure gauge fitted (blank). |
| (blank) | Gauge shape: Factory standard. C is round, F is square. |
| (blank) | Gauge scale: Factory standard. 1 is MPa, 2 is psi, 3 is bar. |
| (blank) | Filtering grade 40 µm. Only 40 µm (blank) and 5 µm (W) exist. |
| (blank) | PT thread. PT is the default; G is BSPP and T is NPT. |
| (blank) | No reverse-flow valve (the default). |
Field order is size, port, drain, type, gauge, shape, scale, grade, thread, reflux — there is no bracket position on a combination. Constituent units, orderable separately as spares: GF400-C1 filter, GR400-C1 regulator and GL400-C1 lubricator.
A GC is three separate units, so the filter and the regulator can each be serviced or replaced on their own. A GFC is the two-unit set, where filtering and regulating share one body — shorter, but the two functions come as one part. Both filter, regulate and lubricate.
| This model | GC400 · See datasheet · 40 µm |
|---|---|
| One size down | GC300 |
| One size up | GC600 |
| Two-unit equivalent | GFC400-C1 |
| Build order | Filter → regulator → lubricator |
Feeds the machining center's pneumatic clamps and tool-change cylinders with filtered, regulated, lubricated air, while the check valve helps hold circuit pressure if the main supply dips.
Supplies the filler and capper air cylinders on a bottling line; the automatic drain handles condensate without an operator stopping by the unit each shift.
Runs the diverters, stoppers and gates along a conveyor system, keeping the lubricated air circuit regulated across a long 1/2-inch distribution drop.
Step up or down through sizes 200, 300, 400 and 600 to match your port and duty; this size 400 listing is fitted with PT1/2 ports. If your plant uses G (BSPP) or NPT threads, order those catalogue variants instead - PT is the standard thread here. The automatic drain suits unattended, continuous-running circuits; choosing a manual-drain version would widen regulator adjustment to 0.05-0.9 MPa (7-130 psi) if you prefer scheduled draining. The 40 um element is the standard grade, with 5 um (W) available for finer filtration. Gauge options and an optional mounting bracket are listed in the series. Flow is published as curves, not a single rating, so ask us to confirm sizing against your application before ordering.
Quick checklist
The PC bowls must not be cleaned with solvents — wipe them with a dry cloth. The lubricator adds an oil mist downstream of the regulator. If any branch of the line must stay oil-free, take that branch off before the lubricator, or use a GR400-C1 regulator with a GF400-C1 filter on that branch.
AirTAC publishes G-series flow as curves rather than a single rated figure, so we do not quote a number on this page. Tell us your line conditions and we will confirm the datasheet and flow curve for GC400C15ANK on request before you order.
K indicates a reverse (check) valve is fitted on the unit; otherwise the code reads the same - automatic drain, standard 40 um element and no gauge. Codes without K are supplied without the check valve.
Genuine AirTAC parts produced by AirTAC factory.
Covers non-human-caused product damage.
Standard models are processed and dispatched in 3-5 business days.
Most inquiries answered within 7-8 hours.
Send us the quantity, thread type (PT / G / NPT), gauge scale and destination. We confirm price, availability and lead time — usually within 7-8 hours.